EUR
99,00
/per piece
incl. 20% VAT. |
In stock.
If an order includes hardening, we will wait to ship until the blade(s) have arrived at our facility and have been hardened. |
The waiting time is approximately 2 weeks.
The sword or blade is hardened and tempered externally by our partner hardening facility.
Afterwards, it is straightened in-house by us.
As a rule, we have the sword hardened to 50 (+-2) HRC.
The material thickness at the edge should be at least approx. 1mm .
During hardening, blades may warp; we will attempt to straighten them, but in extremely rare cases the blade may break. We do not provide any warranty for warping or breakage during hardening.
For further information, please visit our website.